Robbie stained the concrete in one area in the basement under where the pool table will be. It looks pretty cool. It was a 5 step process.
The walk-in shower in the master is complete. Who's going to clean that?
Here is the tub in the master bath.
Here is the fireplace. They installed granite yesterday.
A look at the kitchen cabinets still not quite complete.
The tile guy started on my backsplash today. I found the fleur de lis tile at an art shop and it started as my inspiration for the rest of the area. I love the way it is turning out.